Project experience

Representative assignments, described without client identity.

These examples describe the type of question asked and the work performed. Addresses, client names, surveys, and photographs are not published without written permission.

Projects

Condition assessment · Utility proximity

Dead pine near overhead electrical lines

Situation
A mature pine was reported dead near overhead electrical lines.
Work performed
Field measurements, condition observations, photo documentation, utility-proximity notation, and a written removal recommendation with coordination cautions.
MeasurementsPhoto recordRemoval recommendation

Tree inventory · Residential

Multi-tree inventory for a residential property

Situation
A residential property required an organized inventory and preliminary condition and disposition documentation for several trees.
Work performed
Tree identification, size and condition fields, mapped references, recommended status, and a supporting report package.
Species & sizeMapped referencesDisposition

Tree protection · Construction

Protection planning near proposed work

Situation
Proposed property improvements required protection planning for retained trees.
Work performed
TPZ/CRZ limits, site-plan annotation, protection specifications, and construction-phase recommendations.
TPZ / CRZPlan markupSpecifications

Site conflict · Hardscape

Root, wall, fence, and hardscape conflicts

Situation
Trees or vegetation were located close to existing property improvements or boundaries.
Work performed
Field observations, trunk and canopy measurements, conflict documentation, and recommendations based on accessible conditions.
Conflict documentationNext-step recommendations

Project descriptions reflect the scope of each assignment. They do not imply municipal approval, engineering determinations, or control over utility or permit decisions.

Have a similar situation?

Send the property location and a short description. We will tell you what documentation or work it would involve.